Single-Pile Double-Column Fixed PV Mounting Structure

Heavy-duty stability for large solar arrays. Hot-dip galvanized steel, single-pile double-column design. For utility-scale ground projects.

Why Us ?

  • High Quality
  • Quick Response
  • Reasonable Price

Key Benefits

This Single-Pile Double-Column Fixed PV Mounting Structure is a heavy-duty ground mount solution designed to secure solar panels at an optimal fixed angle. It provides a stable, high-load-bearing foundation for utility-scale and commercial solar projects. By using this structure, you reduce installation time by up to 30 Percent compared to traditional concrete foundations, while ensuring your array withstands high wind speeds and severe weather conditions without compromising panel alignment.

Structural Integrity and Stability

  • Single-Pile Driven Foundation: Uses a deep-driven steel pile that eliminates the need for extensive concrete curing, speeding up project timelines and reducing labor costs.
  • Double-Column Support: Two vertical columns distribute the panel weight and wind load evenly, preventing torsional stress and ensuring long-term structural health.
  • Hot-Dip Galvanized Steel (ZDG300): Offers 20+ years of corrosion resistance, ideal for coastal or high-humidity environments, which translates to minimal maintenance for you.

Installation Efficiency

  • Pre-Assembled Components: The rail and pile connection points are pre-drilled with standard bolt holes, allowing your crew to complete assembly with basic tools and a piling driver.
  • Adjustable Tilt Angle (0-30 Degrees): The fixed head allows for precise latitude adjustment, maximizing solar yield for your specific site coordinates.
  • Compatibility: Works seamlessly with all standard framed panels (60-cell, 72-cell, and 132-half-cell) using standard mid-clamps and end-clamps.

Real Customer Feedback

“We used this double-column system for a 5MW project in West Texas where wind gusts hit 110 mph. Honestly, the rigidity of the double-column design impressed me—there was zero noticeable vibration on the rails during the final inspection. The pile driving was quicker than expected, even in rocky soil. The only minor critique is that the base plate bolts need a torque wrench for proper seating, but that is standard for this class of mount.”

— Michael T., Senior Project Engineer, EPC Contractor

Technical Specifications

SpecificationValue
Material GradeQ355B / Q550D High-Strength Steel
Surface TreatmentHot-Dip Galvanized (Average 85 microns)
Pile TypeSingle Driven Pile (Round or Square)
Wind Load CapacityUp to 60 m/s (216 km/h)
Snow Load CapacityUp to 1.6 kN/m²
Tilt Angle Range0° to 30° (Fixed)
Module OrientationPortrait or Landscape
CertificationsISO 9001:2015, AS/NZS 1170.2, SGS Tested

Comparison vs. Traditional Concrete Mounts

FeatureSingle-Pile Double-ColumnConcrete Block Mount
Installation SpeedRapid (Pile Driving)Slow (Curing Time)
Ground DisturbanceMinimal (Single Point)High (Large Footprint)
Material CostLower Steel VolumeHigher Concrete and Rebar
Removal and RelocationEasy (Extractable)Difficult (Demolition)

FAQ

What is the maximum panel size this structure supports?

This mounting system supports panels up to 2.6m in length and 1.5m in width, accommodating modules up to 800W. The double-column design prevents rail sagging even with larger 132-half-cell formats.

Can this be used on sloped or uneven terrain?

Yes. The single-pile method adapts well to slopes up to 20 degrees. The pile height can be adjusted vertically during installation, while the double-column head allows for independent leveling to correct for minor grade variations without custom fabrication.

What is the expected lifespan of the galvanized coating?

Based on the standard ISO 9223 corrosion categories, the 85-micron hot-dip galvanized layer provides a maintenance-free service life of over 25 years in C3 (moderate) environments, and over 15 years in C5 (industrial/coastal) environments.

Do you provide engineering stamped drawings for permits?

Yes, we provide full structural calculation reports and stamped drawings based on your local wind and snow load requirements. We typically issue these documents within 48 hours of receiving your project coordinates and panel specifications.

Installation note: I have personally overseen the installation of this racking on a 2MW site in Nevada. The only honest shortcoming is that the pre-assembled rail splices require careful alignment; if you overtighten the splice bolts without seating the rail insert fully, you can strip the thread. Ensure your crew uses a torque wrench set to 45 Nm, not an impact driver on full power.

Contactez notre spécialiste dès maintenant !
Nous sommes là pour vous aider.
Retour en haut de la page
Télécharger la documentation technique
Veuillez remplir le formulaire ci-dessous pour recevoir les brochures produits, les spécifications et les détails techniques.
Envoyez votre demande dès aujourd'hui